Tokyo Tama 3
Tokyo Tama 3 is located in the west suburbs of Tokyo and newly opened in February 2016.
The maximum power per rack is 42kVA (design) and the average is 21kVA (design) which is the highest level available in Japan.
The Data Center offers high-density colocation services enabling the hosting of heavy load IT infrastructure and meeting a wide range of customer needs, from private cloud to business, Internet content and public cloud infrastructure.
Tama 3 is an energy-efficient green data center utilizing the latest technology
The latest energy efficient equipment and LED lighting employed to achieve 1.31 PUE (designed).
Tier 4 Facility
Tier 4 level Data Center certified by Japan Data Center Council (JDCC-PS*). Complies with Telehouse global guidelines for Data Center specification, operation and maintenance of equipment and service operations. The facility contains over 100 self standard provisions globally standardized high qualified services are provided as the same level as other Telehouse Data centers overseas.
(*) Data center facility standard for toughness, availability and security capability
Disaster-Resistant Structure
Tama is located in a disaster-resistant area*, 30 km away from the center of Tokyo. The facility is not affected by earthquakes. With hybrid earthquake-proof structure accommodating a long-period earthquake ground motion quake absorption structure.
(*) Ranked in the highest in “Research of the earthquake risk (7th)” by BUREAU OF URBAN DEVELOPMENT TOKYO METROPOLITAN GOVERNMENT.
Highest Available Power
This large-scale facility provides power up to 42 kVA per rack (designed) per rack which is the highest amount of power available in Japan and enables the hosting of heavy load IT infrastructure. Redundant access to power assures high reliability in operation, of customer equipment.
Largest Electrical Capacity
Tama 3 offers the largest electricity capability among Data Center providers in Japan to meet customers’ high density requirement. Suitable for private enterprises cloud hosting as well as global public cloud companies, web services and media content providers.
Customer Operations Rooms
The Data Center is equipped with conference rooms a rest area, customer operation rooms, nap room and shower room, requested by many of our customers. Each floor has a staging room, making for an environment that allows for a smooth launch even after the initial installation.
UPS Backup Battery Supply
The UPS battery backup room ensures continuity in case of power outages.
Data Center Specifications
Building
- Located inTama-city, Tokyo
- Approximately 1,300 Racks
- Steel construction
Quake absorbing infrastructure - 5 story building
Power Supply:
- 66kV, Primary and backup lines
- N+1 redundant configuration
(Available for over 48h without feeding) - N+1 redundant configuration
*Available for 15 minutes
*Customizable at customer’s request
Max: 42kVA /rack (Designed)
30kVA/rack (Effective)
Average: 21kVA/rack (Designed)
15kVA/rack (Effective)
Total: 14MW
Air Conditioning and Cooling:
- Air cooling module chiller
(Cool air pushed up from underneath raised floor) - CRAC Configuration: N+2 redundant configuration with UPS
Security
- 24/7 Security Guard
- ISO27001(ISMS) Certification
- Manned monitoring, Surveillance camera, Proximity IC card, Biometric Authentication, Man trap door, Security gate