Osaka Data Centers
Built as the major Telehouse Data Center for the west of Japan, our Osaka 2 Data Center facility began service on 21st August, 2015.
The maximum power per rack is 30kVA (design) and the average is 15kVA (design) which is the highest level in Japan. The Data Center offers high-density colocation services enabling the hosting of heavy load IT infrastructure and meeting a wide range of customer needs – from private cloud to business, Internet content and public cloud infrastructure.
Osaka 2: Highest Level of Power
Power available up to 30 kVA per rack (designed) which is the highest level in Japan and enables to host heavy load infrastructure and manage a large-scale space. Redundant access to power assures high reliability in operation, of customer equipment. View Data Center Specs
Disaster Resistant Structure
The technical and operations room is situated above the second floor of our Tokyo Data Center, avoiding the risk of potential flooding. The facility is resistant to earthquake with hybrid earthquake-proof structure accommodating a long-period earthquake ground motion quake absorption.
Reliable Security
Security features include:
- Single point entry
- Man Trap door
- security guards
- CCTV, IC card system
- biometric authentication system
Tier 4 Level
Certified by Japan Data Center Council (JDCC-PS*). Complies with Telehouse global guidelines for Data Center specifications, operation and maintenance of equipment and service operation. This includes over 100 self standard provisions. Globally standardized services are provided as the same level as all Telehouse Data Centers.
(*) Data center facility standard for toughness, availability and security capability